000 nam a22 i 4500
999 _c3470
_d3468
005 20171203133533.0
008 171203s2012 bg a f000 0 eng
010 _a 2013413434
025 _aB-E-2013-413434; 22-91
040 _aDLC
_beng
_erda
_cDLC
_dDLC
_dBD-DhBCSAA
042 _alcode
043 _aa-bg---
050 0 0 _aHE3300.6
_b.I46 2012
082 0 0 _a385.95492
_bMII 2012
245 0 0 _aImpact evaluation study on rehabilitation of main line sections of Bangladesh Railway (West Zone) (2nd revised) /
_ccarried out by Evaluation Sector, Implementation Monitoring and Evaluation Division, Ministry of Planning, Government of the People's Republic of Bangladesh ; conducted by Technoconsult International Limited.
246 1 4 _aImpact evaluation study of Rehabilitation of Main line Sections of Bangladesh Railway Project (West Zone) (2nd revised)
264 1 _aDhaka :
_bEvaluation Sector, Implementation Monitoring and Evaluation Division, Ministry of Planning, Government of the People's Republic of Bangladesh,
_c2012.
300 _a1 volume (various paging) :
_bcolor illustrations ;
_c29 cm
336 _atext
_btxt
_2rdacontent
337 _aunmediated
_bn
_2rdamedia
338 _avolume
_bnc
_2rdacarrier
590 _anahid
610 2 0 _aRehabilitation of Main line Sections of Bangladesh Railway Project (West Zone)
_xEvaluation.
_98013
650 0 _aRailroads
_zBangladesh
_xEvaluation.
_98014
710 1 _aBangladesh.
_bBāstabāẏana Paribīkshaṇa o Mulyāẏana Bibhāga.
_bEvaluation Wing.
_98015
710 2 _aTechnoconsult International Limited (Dhaka, Bangladesh).
_98016
906 _a7
_bcbc
_corignew
_d3
_encip
_f20
_gy-gencatlg
942 _2ddc
_cBK